• PORTAL RASMI AGENSI NUKLEAR MALAYSIA

Keselamatan Operasi dan Meningkatkan Penggunaan RTP

Keselamatan Operasi dan Meningkatkan Penggunaan RTP

Projek utama PTR:

No

Tajuk Projek

Fund

Ketua Projek

Tempoh

1.

Reactor TRIGA PUSPATI thermal power monitoring and PC-based data acquisition system (DAQ)

 

Zaredah Hashim

Jun'20-Nov'21

2.

Neutron characteristics profiling at the RTP irradiation in-core and beamport facilities

 

Mark Dennis Usang

Jan'21-Dec'22

3.

Upgrade: Instrumental Delayed Neutron Activation Analysis System (IDNAA)

P30009001003009

Ridzuan Abdul Mutalib

 

4.

A study of a new power controller algorithm based on Transfer Function Model-based Predictive Control (TFMPC) for the research power generation nuclear reactor TRIGA

FRGS/1/2017/
TK04/UTM/02/55

Dr. Nurul Adilla Mohd Subha (UTM);
Mohd Sabri Minhat

2017-2021

5.

Development of RTP training program

 

Dr. Mazleha Maskin

2021-2023

6.

Integrated Management System (IMS) - revamp and restructure

 

Dr. Mazleha Maskin

2021-2023